Show simple item record

Authordc.contributor.authorMorales, N. 
Authordc.contributor.authorReyes, P. 
Admission datedc.date.accessioned2018-03-06T15:29:03Z
Available datedc.date.available2018-03-06T15:29:03Z
Publication datedc.date.issued2016
Cita de ítemdc.identifier.citationThe Journel of the Southern African Institute of Mining and Metallurgy, vol. 116: july 2016, p. 663es_ES
Identifierdc.identifier.issn2411-9717
Identifierdc.identifier.other10.17159/2411-9717/2016/v116n7a8
Identifierdc.identifier.urihttps://repositorio.uchile.cl/handle/2250/146717
Abstractdc.description.abstractWe present a model that allows us to consider mine production scheduling coupled with the mining system at different levels of detail: from the standard origin-destination approach to a network considering different processing paths. Each of these is characterized by variable costs, capacities, and geometallurgical constraints. We then apply this model to a real mine, comparing the results with those obtained by traditional methodology: the destination of materials defined a priori, before computing the schedules, using standard criteria like cut-off grades. As expected, using optimization to schedule and define dynamically the best processing alternatives shows a big opportunity for potential value improvement. However, the main result is that using only origindestination and fixed cut-off grades may produce schedules that are not feasible when the actual constraints of the mining system are taken into account. Therefore, it is essential to include the considerations proposed in the planning process.es_ES
Lenguagedc.language.isoenes_ES
Publisherdc.publisherThe Southern African Institute of Mining and Metallurgyes_ES
Type of licensedc.rightsAttribution-NonCommercial-NoDerivs 3.0 Chile*
Link to Licensedc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/cl/*
Sourcedc.sourceThe Journel of the Southern African Institute of Mining and Metallurgyes_ES
Keywordsdc.subjectmining system.es_ES
Keywordsdc.subjectmulti-destinationes_ES
Keywordsdc.subjectchedulinges_ES
Keywordsdc.subjectopen pites_ES
Keywordsdc.subjectoptimizationes_ES
Keywordsdc.subjectmine planninges_ES
Títulodc.titleIncreasing the value and feasibility of open pit plans by integrating the mining system into the planning processes_ES
Document typedc.typeArtículo de revista
Catalogueruchile.catalogadorcrbes_ES
Indexationuchile.indexArtículo de publicación ISIes_ES
Indexationuchile.indexArtículo de publicación SCOPUSes_ES
Indexationuchile.indexArtículo de publicación SCIELOes_ES


Files in this item

Icon

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivs 3.0 Chile
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivs 3.0 Chile