Show simple item record

Authordc.contributor.authorEpstein Numhauser, Rafael 
Authordc.contributor.authorGoic Figueroa, Marcel es_CL
Authordc.contributor.authorWeintraub Pohorille, Andrés es_CL
Authordc.contributor.authorCatalán, Jaime es_CL
Authordc.contributor.authorSantibáñez, Pablo es_CL
Authordc.contributor.authorUrrutia, Rodolfo es_CL
Authordc.contributor.authorCancino, Raúl es_CL
Authordc.contributor.authorGaete, Sergio es_CL
Authordc.contributor.authorAguayo, Augusto es_CL
Authordc.contributor.authorCaro Valdés, Felipe es_CL
Admission datedc.date.accessioned2012-05-31T16:29:12Z
Available datedc.date.available2012-05-31T16:29:12Z
Publication datedc.date.issued2012-02
Cita de ítemdc.identifier.citationOPERATIONS RESEARCH Vol. 60, No. 1, January–February 2012, pp. 4–17es_CL
Identifierdc.identifier.issn0030-364X (print)
Identifierdc.identifier.urihttps://repositorio.uchile.cl/handle/2250/125625
Abstractdc.description.abstractWe present a methodology for long-term mine planning based on a general capacitated multicommodity network flow formulation. It considers underground and open-pit ore deposits sharing multiple downstream processing plants over a long horizon. The purpose of the model is to optimize several mines in an integrated fashion, but real size instances are hard to solve due to the combinatorial nature of the problem. We tackle this by solving the relaxation of a tight linear formulation, and we round the resulting near-integer solution with a customized procedure. The model has been implemented at Codelco, the largest copper producer in the world. Since 2001, the system has been used on a regular basis and has increased the net present value of the production plan for a single mine by 5%. Moreover, integrating multiple mines provided an additional increase of 3%. The system has allowed planners to evaluate more scenarios. In particular, the model was used to study the option of delaying by four years the conversion of Chiquicamata, Codelco’s largest open-pit mine, to underground operations.es_CL
Patrocinadordc.description.sponsorshipFONDEF D03I1064, Institute of Complex Engineering Systemses_CL
Lenguagedc.language.isoenes_CL
Keywordsdc.subjectindustries: mining/metalses_CL
Títulodc.titleOptimizing Long-Term Production Plans in Underground and Open-Pit Copper Mineses_CL