Authordc.contributor.authorAnindito, Yoga 
Authordc.contributor.authorHaas, Jannik 
Authordc.contributor.authorOlivares, Marcelo 
Authordc.contributor.authorNowak, Wolfgang 
Authordc.contributor.authorKern, Jordan 
Admission datedc.date.accessioned2019-05-31T15:33:59Z
Available datedc.date.available2019-05-31T15:33:59Z
Publication datedc.date.issued2019
Cita de ítemdc.identifier.citationJournal of Cleaner Production 210 (2019) 477-489
Identifierdc.identifier.issn09596526
Identifierdc.identifier.other10.1016/j.jclepro.2018.11.040
Identifierdc.identifier.urihttps://repositorio.uchile.cl/handle/2250/169698
Abstractdc.description.abstractHydropower plants frequently operate at high output during peak hours and at low output (or even shutoff) during off-peak hours. This scheme, called "hydropeaking", is harmful to downstream ecosystems. Operational constraints (minimum flows, maximum ramps) are frequently used to mitigate the impacts of hydropeaking. However, they reduce the operational flexibility of hydroelectric dams and increase the operational cost of power systems. Another approach to mitigating ecological impacts from hydropeaking is using structural measures, such as re-regulation reservoirs or afterbays. The first contribution of our work is to study the cost-effectiveness of these re-regulation reservoirs in mitigating ecological impacts from subdaily hydropeaking. Our second contribution is assessing energy storage (specifically, batteries) to mitigate the financial impacts of implementing peaking restrictions on dams, which represents the first attempt in the literature. Understanding these mitigation options is relevant for new hydropower dams, as well as for existing ones undergoing relicensing processes. For this, we formulate an hourly mixed-integer linear optimization model to simulate the annual operation of a power system. We then compare the business-as-usual (unconstrained) hydropower operations with ecologically constrained operations. The constrained operation, by limiting hydropower ramping rates, showed to obtain flows close to the natural streamflow regime. As next step, we show how re-regulation reservoirs and batteries can help to achieve these ecological constraints at lower costs. While the former are cost-effective for a very broad range of investment costs, the latter will be cost-effective for hydro peaking mitigation from 2025 onwards, when their capital costs have fallen. If more stringent environmental constraints are imposed, both solutions become significantly more attractive. The same holds for scenarios of more renewable generation (in which the operational flexibility from both alternatives becomes more valuable). After 2030, batteries can match the cost-effectiveness of expensive re regulation reservoirs. Our findings are valuable for policy and decision makers in energy and ecosystem conservation.
Lenguagedc.language.isoen
Publisherdc.publisherElsevier
Type of licensedc.rightsAttribution-NonCommercial-NoDerivs 3.0 Chile
Link to Licensedc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/cl/
Sourcedc.sourceJournal of Cleaner Production
Keywordsdc.subjectBattery energy storage
Keywordsdc.subjectEcosystems
Keywordsdc.subjectHydrological alteration
Keywordsdc.subjectRichard baker flashiness index
Keywordsdc.subjectRivers and streams
Títulodc.titleA new solution to mitigate hydropeaking? Batteries versus re-regulation reservoirs
Document typedc.typeArtículo de revista
Catalogueruchile.catalogadorlaj
Indexationuchile.indexArtículo de publicación SCOPUS
uchile.cosechauchile.cosechaSI


Files in this item

Icon

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivs 3.0 Chile
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivs 3.0 Chile