Show simple item record

Authordc.contributor.authorJélvez, Enrique 
Authordc.contributor.authorMorales Varela, Nelson 
Authordc.contributor.authorNancel Penard, Pierre 
Authordc.contributor.authorCornillier, Fabien 
Admission datedc.date.accessioned2020-05-28T19:24:03Z
Available datedc.date.available2020-05-28T19:24:03Z
Publication datedc.date.issued2020
Cita de ítemdc.identifier.citationOmega 94 (2020) 102046es_ES
Identifierdc.identifier.other10.1016/j.omega.2019.03.004
Identifierdc.identifier.urihttps://repositorio.uchile.cl/handle/2250/175066
Abstractdc.description.abstractIn this work we address the Precedence Constrained Production Scheduling Problem (PCPSP), the problem of scheduling tasks in such a way that total profit is maximized, while satisfying conditions such as precedence constraints among tasks and side constraints. A motivation for addressing this problem comes from open-pit mining industry, where the PCPSP seeks to maximize the net present value of an ore deposit by selecting the blocks (tasks) to extract, their extraction periods and their processing options, while satisfying constraints as precedences among blocks, limited availability of operational resources and maximum and/or minimum allowable concentrations of ore-grade or pollutants. Since real-world models have millions of blocks and constraints, the monolithic problem is computationally intractable. This article presents a hybrid heuristic algorithm that combines a rolling horizon decomposition with a block preselection procedure, allowing near-optimal solutions to be quickly determined. The proposed heuristic was tested on all the PCPSP instances of the MineLib library and has shown a significant improvement over the previous reported results. Moreover, a good feasible solution has been found for the instance W23, for which no solution has been previously reported.es_ES
Patrocinadordc.description.sponsorshipCONICYT Basal Project - Advanced Mining Technology Center - Universidad de Chile FB0809es_ES
Lenguagedc.language.isoenes_ES
Publisherdc.publisherElsevieres_ES
Type of licensedc.rightsAttribution-NonCommercial-NoDerivs 3.0 Chile*
Link to Licensedc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/cl/*
Sourcedc.sourceOmega-International Journal of Management Sciencees_ES
Keywordsdc.subjectPrecedence constrained production schedulinges_ES
Keywordsdc.subjectOpen-pit mine production planninges_ES
Keywordsdc.subjectHybrid heuristices_ES
Keywordsdc.subjectMixed-integer linear programminges_ES
Títulodc.titleA new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining applicationes_ES
Document typedc.typeArtículo de revistaes_ES
dcterms.accessRightsdcterms.accessRightsAcceso Abierto
Catalogueruchile.catalogadorcrbes_ES
Indexationuchile.indexArtículo de publicación ISI
Indexationuchile.indexArtículo de publicación SCOPUS


Files in this item

Icon

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivs 3.0 Chile
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivs 3.0 Chile