Integrated power system expansion planning with distributed energy resources under deep uncertainty
Professor Advisor
dc.contributor.advisor
Moreno Vieyra, Rodrigo
Author
dc.contributor.author
Apablaza Donoso, Pablo Iván Matías
Associate professor
dc.contributor.other
Flores Quiroz, Ángela
Associate professor
dc.contributor.other
Pierluigi, Mancarella
Admission date
dc.date.accessioned
2024-10-17T19:05:05Z
Available date
dc.date.available
2024-10-17T19:05:05Z
Publication date
dc.date.issued
2024
Identifier
dc.identifier.other
10.58011/a25y-mt33
Identifier
dc.identifier.uri
https://repositorio.uchile.cl/handle/2250/201589
Abstract
dc.description.abstract
La creciente adopción de los recursos energéticos distribuidos (DER) está transformando la planificación de los sistemas eléctricos. Estos activos, conectados a las redes de distribución, pueden brindar servicios de flexibilidad que impactan las decisiones de inversión en transmisión. Este trabajo investiga cómo la flexibilidad operacional derivada del control y agregación de los DER puede influir en la expansión de la transmisión. Dada la interacción de la flexibilidad proveniente de diferentes tecnologías, es crucial representar las incertidumbres con precisión para evitar sobreestimar o subestimar la flexibilidad de los DER. Se propone un modelo de planificación de la expansión estocástico multietapa que optimiza las inversiones en transmisión y almacenamiento y servicios de DER frente a restricciones operativas detalladas e incertidumbres de largo plazo modeladas en un arbol de escenarios. Los casos de estudio dentro del National Electricity Market, Australia (NEM) muestran que un modelo determinista puede sobrestimar la capacidad de los DER controlables para desplazar las inversiones en transmisión en las etapas iniciales. Por el contrario, el modelo estocástico propuesto proporciona una evaluación más moderada, manteniendo una estimación más constante del potencial de desplazamiento de la inversión en transmisión por los DER controlables.
es_ES
Abstract
dc.description.abstract
The massive uptake of distributed energy resources (DER) is transforming the way power
systems are planned. Decentralised assets connected to distribution networks are beginning to
coexist with traditional network devices in the technology mix, impacting the investment decisions
of new large-scale assets due to the flexibility services the former can provide to the operation of
the system. This work investigates how the operational flexibility from DER controllability can
influence the expansion of transmission and storage. Given the interplay of different technologies,
accurately representing uncertainties is essential to avoid over or underestimating the flexibility
of DER. To address this challenge, a multi-stage stochastic expansion planning model is proposed.
The model can optimise transmission and storage investments, and DER services against longterm uncertainties and detailed operational constraints. A four-stage scenario tree is employed to
represent uncertainties and a Dantzig-Wolfe decomposition within a column generation approach
is used to tackle computational challenges. Case studies within the Australian National Electricity Market (NEM) demonstrate that a deterministic model could overestimate the capability of
controllable DER to displace transmission investments in the early stages. Conversely, the proposed stochastic model provides a more measured assessment, maintaining a steadier estimate of
transmission displacement potential by controllable DER throughout various stages.
es_ES
Patrocinador
dc.description.sponsorship
Este trabajo ha sido parcialmente financiado por:
ANID BECAS / MAGÍSTER NACIONAL / 2023 22231021
es_ES
Lenguage
dc.language.iso
en
es_ES
Publisher
dc.publisher
Universidad de Chile
es_ES
Type of license
dc.rights
Attribution-NonCommercial-NoDerivs 3.0 United States