Show simple item record

Professor Advisordc.contributor.advisorPalma Villagrán, Jorge
Authordc.contributor.authorLópez Solar, Felipe Alberto 
Associate professordc.contributor.otherValencia Vera, María Elena
Associate professordc.contributor.otherMorales Varela, Nelson
Admission datedc.date.accessioned2016-09-29T19:09:47Z
Available datedc.date.available2016-09-29T19:09:47Z
Publication datedc.date.issued2016
Identifierdc.identifier.urihttps://repositorio.uchile.cl/handle/2250/140578
General notedc.descriptionMemoria para optar al título de Ingeniero Civil de Minases_ES
Abstractdc.description.abstractEn la gran minería a cielo abierto, los sistemas pala-camión son ampliamente usados para realizar la labor de carguío y transporte. Actualmente este ítem abarca cerca del 50% de los costos de operación y en donde las principales mejoras se logran a través de una gestión óptima de la disponibilidad, confiabilidad y mantenimiento del sistema. En el caso de la minera en estudio, el costo Planta asciende al 48% del costo de caja, y el 25% de este último corresponde al costo del chancado. El principal objetivo de este estudio es determinar el ritmo de producción de Minera Antucoya en plena operación, en base a las variables y supuestos determinados en la fase de proyecto y construcción, incluyendo en cada uno de los equipos del procesamiento de mineral, sus tiempos de reparación y entre fallas, aplicados en base a distribuciones de probabilidad. La metodología aplicada a este trabajo consta del desarrollo de un modelo de simulación basado en un modelo conceptual, que detalla supuestos, parámetros, variables, criterios de diseño y operación utilizados, que permiten una comprensión del sistema modelado. La codificación el modelo en la plataforma ProModel® obtiene como resultado una producción anual de 30,77 Mt. Luego de calcular la simulación terminante, se comprueba que con sólo una corrida es suficiente. El paso siguiente fue calibrar el modelo para generar un sistema que soporte capacidades de emergencia en caso de déficit de producción. Luego de esto se validaron por partes y verificaron los indicadores para equipos principales de las tres etapas de chancado. Su resultado fue una producción de 32,76 Mtpa, lo que equivale a un beneficio marginal de US$ 27,4 MM. Se recomienda continuar este estudio, de manera de poder replicar las condiciones de la operación con una base de datos actualizada, considerando al menos aumentar el límite de batería hasta las pilas de lixiviación, para de esta forma obtener estimaciones más cercanas a su real desempeño.es_ES
Abstractdc.description.abstractIn large scale open pit mining, shovel-truck system are widely used for loading and haulage labors. Actually, this item represents nearly 50% of operating costs, where main improvements are achieved through optimal management of availability, reliability and maintenance of the system. In this particular study case, processing costs reach 48% of cash costs, where 25% of this given cost comes into the crushing step. Main purpose of this study is to determine the production rate of Antucoya Mining in full operation, based on variables and suppositions determined during the project and construction phases, including for each processing unit, its maintenance times between malfunctions applied on probabilistic distributions. The methodology applied for this study includes the development of a simulation model based on a conceptual model, which specifies suppositions, parameters, variables, design and operation criterion that allow a comprehensive patterned system. The code lines of the model used in ProModel® platform delivers an annual production rate of 30.77 Mt. After calculating the finishing simulation, it is proven that a single run is enough. The next step is to calibrate the model to generate a system that supports emergency capacities in case of a lacking production. After this, the indicators for the 3 main crushing stages were validated and verified individually. With this, a new production of 32.76 Mtpa is achieved which represent a marginal profit of US$ 27.4M. It is advised to further continue this study in order to replicate the operating conditions using updated data and increasing at least the battery limit to leaching piles, allowing the model to obtain more realistic estimations.es_ES
Lenguagedc.language.isoeses_ES
Publisherdc.publisherUniversidad de Chilees_ES
Type of licensedc.rightsAttribution-NonCommercial-NoDerivs 3.0
Link to Licensedc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/cl/
Keywordsdc.subjectIndustria minera - Chilees_ES
Keywordsdc.subjectAcarreo mineroes_ES
Keywordsdc.subjectAdministración de la producciónes_ES
Keywordsdc.subjectIndustria minera - Planificación - Métodos de simulaciónes_ES
Keywordsdc.subjectSimulación de eventos discretoses_ES
Títulodc.titleDiagnóstico productivo en las operaciones unitarias de transporte y planta de chancado de Minera Antucoya mediante simulación dinámica de eventos discretoses_ES
Document typedc.typeTesis
Catalogueruchile.catalogadorgmmes_ES
Departmentuchile.departamentoDepartamento de Ingeniería de Minas
Facultyuchile.facultadFacultad de Ciencias Físicas y Matemáticases_ES


Files in this item

Icon
Icon

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivs 3.0
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivs 3.0