Show simple item record

Authordc.contributor.authorZurita, Adriana 
Authordc.contributor.authorMata Torres, Carlos 
Authordc.contributor.authorCardemil Iglesias, José Miguel 
Authordc.contributor.authorEscobar, Rodrigo A. 
Admission datedc.date.accessioned2020-06-08T22:48:30Z
Available datedc.date.available2020-06-08T22:48:30Z
Publication datedc.date.issued2020
Cita de ítemdc.identifier.citationSolar Energy 202 (2020) 553–570es_ES
Identifierdc.identifier.other10.1016/j.solener.2020.03.100
Identifierdc.identifier.urihttps://repositorio.uchile.cl/handle/2250/175312
Abstractdc.description.abstractThis study analyzes the time resolution impact on the modeling of a hybrid CSP-PV plant integrated with thermal storage and a battery bank for two locations in Chile. Daily and annual results were evaluated varying the time resolution from 1, 5, 10, 15, 30 to 60 min, as well as the capacity factor and LCOE. In this way, the CSP plant was the component most affected by the time resolution, followed by the battery dispatch, while the effect on PV production estimation was marginal. Control procedures of the receiver and power block were more realistically captured with time steps between 1 and 5 min, while with higher time steps, variability effects were neglected. Annual and techno-economic results indicate an overestimation of the total yearly production of the hybrid plant as the time step is increased, leading to an underestimation of the LCOE. Variations in the capacity factor and LCOE were around +/- 2-3% in both locations using the 5-minute time step (with respect to the 1-min results), and between +/- 4-6% using 10-60 min time steps. Different cases of study varying the dispatch strategy and components sizing were evaluated, showing that time resolution impact is lower for oversized PV configurations with respect to the CSP plant, and higher when the CSP plant is oversized with respect to the PV, regardless the dispatch strategy. Finally, this work provides some recommendations analyzing the advantages and drawbacks of implementing different time steps at each stage in the development of a hybrid solar power plant.es_ES
Patrocinadordc.description.sponsorshipFraunhofer Chile Research - Center of Solar Energy Technologies by the Corfo project 13CEI2-21803 Comision Nacional de Investigacion Cientifica y Tecnologica (CONICYT) CONICYT FONDAP 15110019 CONICYT PFCHA/Doctorado Nacional 2019 21191591 CONICYT PFCHA/Doctorado Nacional 2018 21181537 Pontificia Universidad Catolica de Chile VRI doctoral scholarshipes_ES
Lenguagedc.language.isoenes_ES
Publisherdc.publisherElsevieres_ES
Type of licensedc.rightsAttribution-NonCommercial-NoDerivs 3.0 Chile*
Link to Licensedc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/cl/*
Sourcedc.sourceSolar Energyes_ES
Keywordsdc.subjectChilees_ES
Keywordsdc.subjectCSP-PVes_ES
Keywordsdc.subjectCSP modelinges_ES
Keywordsdc.subjectHybrid plantes_ES
Keywordsdc.subjectTime resolutiones_ES
Títulodc.titleAssessment of time resolution impact on the modeling of a hybrid CSP-PV plant: a case of study in Chilees_ES
Document typedc.typeArtículo de revistaes_ES
dcterms.accessRightsdcterms.accessRightsAcceso Abierto
Catalogueruchile.catalogadorapces_ES
Indexationuchile.indexArtículo de publicación ISI
Indexationuchile.indexArtículo de publicación SCOPUS


Files in this item

Icon

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivs 3.0 Chile
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivs 3.0 Chile