Show simple item record

Authordc.contributor.authorOrtiz Cabrera, Julián 
Authordc.contributor.authorRubio, Enrique es_CL
Authordc.contributor.authorYarmuch Guzmán, Juan Luis es_CL
Admission datedc.date.accessioned2010-03-29T19:40:33Z
Available datedc.date.available2010-03-29T19:40:33Z
Publication datedc.date.issued2007
Identifierdc.identifier.urihttps://repositorio.uchile.cl/handle/2250/125295
Abstractdc.description.abstractThis paper summarizes a research to develop an optimization algorithm used to support short term planning decisions in an open pit operation. In particular, it is sought to use this algorithm to evaluate block models that have been computed using different geostatistical techniques. This leads to several production schedules, each representing the best production option for a given block model. Then, these schedules are compared against a most likely optimal schedule that uses blast hole grade information as a main input. This comparison provides sufficient information to decide upon the geostatistical method that better forecasts a given production schedule. The optimization algorithm is oriented to minimize production deviations with respect to the medium term plan (yearly budget) subject to uniform grade fed to the plant over a period of time (e.g. a week), minimum tonnage fed, shovels digability, among others. The algorithm will report the path that needs to be followed at different mining faces in order to reach optimality. The method proposed is of direct optimization, in which all the possible combinations in short time steps are evaluated explicitly hence allowing decision making regarding the path to be followed. Finally, the geoestatistical method that better predicts the actual mining outcome is determined. This path minimizes deviations regarding the medium term production targets. The method is implemented and validated with actual data: a reserves model is built from drillhole data using several geostatistical models, namely, ordinary kriging and Gaussian simulation. The models are compared with blasthole data that is effectively used to make the decision of sending the blocks to the processing plant or to the waste dump. The responses from different geostatistical models are compared with the optimized schedule determined with the optimization methodology described.en_US
Patrocinadordc.description.sponsorshipThis project was funded by the National Fund for Science and Technology of Chile (FONDECYT) and is part of project 1061260en_US
Lenguagedc.language.isoenen_US
Keywordsdc.subjectblock modelen_US
Títulodc.titleAn optimization algorithm to assess different reserves models for open pit short term planningen_US
Document typedc.typeArtículo de revista


Files in this item

Icon

This item appears in the following Collection(s)

Show simple item record