About
Contact
Help
Sending publications
How to publish
Advanced Search
View Item 
  •   Home
  • Facultad de Ciencias Físicas y Matemáticas
  • Artículos de revistas
  • View Item
  •   Home
  • Facultad de Ciencias Físicas y Matemáticas
  • Artículos de revistas
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse byCommunities and CollectionsDateAuthorsTitlesSubjectsThis CollectionDateAuthorsTitlesSubjects

My Account

Login to my accountRegister
Biblioteca Digital - Universidad de Chile
Revistas Chilenas
Repositorios Latinoamericanos
Tesis LatinoAmericanas
Tesis chilenas
Related linksRegistry of Open Access RepositoriesOpenDOARGoogle scholarCOREBASE
My Account
Login to my accountRegister

An optimization algorithm to assess different reserves models for open pit short term planning

Artículo
Thumbnail
Open/Download
Icon124908_C2_2007-07-MPES-Ortiz-Rubio-Yarmuch.pdf (375.5Kb)
Publication date
2007
Metadata
Show full item record
Cómo citar
Ortiz Cabrera, Julián
Cómo citar
An optimization algorithm to assess different reserves models for open pit short term planning
.
Copiar
Cerrar

Author
  • Ortiz Cabrera, Julián;
  • Rubio, Enrique;
  • Yarmuch Guzmán, Juan Luis;
Abstract
This paper summarizes a research to develop an optimization algorithm used to support short term planning decisions in an open pit operation. In particular, it is sought to use this algorithm to evaluate block models that have been computed using different geostatistical techniques. This leads to several production schedules, each representing the best production option for a given block model. Then, these schedules are compared against a most likely optimal schedule that uses blast hole grade information as a main input. This comparison provides sufficient information to decide upon the geostatistical method that better forecasts a given production schedule. The optimization algorithm is oriented to minimize production deviations with respect to the medium term plan (yearly budget) subject to uniform grade fed to the plant over a period of time (e.g. a week), minimum tonnage fed, shovels digability, among others. The algorithm will report the path that needs to be followed at different mining faces in order to reach optimality. The method proposed is of direct optimization, in which all the possible combinations in short time steps are evaluated explicitly hence allowing decision making regarding the path to be followed. Finally, the geoestatistical method that better predicts the actual mining outcome is determined. This path minimizes deviations regarding the medium term production targets. The method is implemented and validated with actual data: a reserves model is built from drillhole data using several geostatistical models, namely, ordinary kriging and Gaussian simulation. The models are compared with blasthole data that is effectively used to make the decision of sending the blocks to the processing plant or to the waste dump. The responses from different geostatistical models are compared with the optimized schedule determined with the optimization methodology described.
Patrocinador
This project was funded by the National Fund for Science and Technology of Chile (FONDECYT) and is part of project 1061260
Identifier
URI: https://repositorio.uchile.cl/handle/2250/125295
Collections
  • Artículos de revistas
xmlui.footer.title
31 participating institutions
More than 73,000 publications
More than 110,000 topics
More than 75,000 authors
Published in the repository
  • How to publish
  • Definitions
  • Copyright
  • Frequent questions
Documents
  • Dating Guide
  • Thesis authorization
  • Document authorization
  • How to prepare a thesis (PDF)
Services
  • Digital library
  • Chilean academic journals portal
  • Latin American Repository Network
  • Latin American theses
  • Chilean theses
Dirección de Servicios de Información y Bibliotecas (SISIB)
Universidad de Chile

© 2020 DSpace
  • Access my account