About
Contact
Help
Sending publications
How to publish
Advanced Search
View Item 
  •   Home
  • Facultad de Ciencias Físicas y Matemáticas
  • Artículos de revistas
  • View Item
  •   Home
  • Facultad de Ciencias Físicas y Matemáticas
  • Artículos de revistas
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse byCommunities and CollectionsDateAuthorsTitlesSubjectsThis CollectionDateAuthorsTitlesSubjects

My Account

Login to my accountRegister
Biblioteca Digital - Universidad de Chile
Revistas Chilenas
Repositorios Latinoamericanos
Tesis LatinoAmericanas
Tesis chilenas
Related linksRegistry of Open Access RepositoriesOpenDOARGoogle scholarCOREBASE
My Account
Login to my accountRegister

Geometallurgical modelling of the Collahuasi flotation circuit

Artículo
Thumbnail
Open/Download
IconSuazo_CJ.pdf (390.4Kb)
Publication date
2010
Metadata
Show full item record
Cómo citar
Suazo, C. J.
Cómo citar
Geometallurgical modelling of the Collahuasi flotation circuit
.
Copiar
Cerrar

Author
  • Suazo, C. J.;
  • Kracht Gajardo, Willy;
  • Alruiz, O. M.;
Abstract
The flotation rate constant was modelled as a function of air dispersion properties and the complete feed particle size distribution by using the collision–attachment–detachment approach and introducing a parameter (U) which represents the inherent floatability of the ore. It was found that this parameter U is characteristic of the geometallurgical unit and does not depend on the main operating conditions. The parameter U is dimensionless and can be estimated either from laboratory testwork or directly from an industrial kinetics survey and can be used to predict industrial operation, provided that the other components of the model are evaluated under actual operation conditions. An empirical expression for the maximum achievable recovery – infinite time recovery – is also presented. The complete model, including flotation rate constant and infinite time recovery, was tested showing good correlation at both laboratory and industrial scale. At industrial scale the model was able to predict metallurgical results in a time frame of several weeks at Compañia Minera Doña Inés de Collahuasi SCM, showing an average relative error of less than 2%.
Identifier
URI: https://repositorio.uchile.cl/handle/2250/125443
DOI: doi:10.1016/j.mineng.2009.11.005
Quote Item
Minerals Engineering 23 (2010) 137–142
Collections
  • Artículos de revistas
xmlui.footer.title
31 participating institutions
More than 73,000 publications
More than 110,000 topics
More than 75,000 authors
Published in the repository
  • How to publish
  • Definitions
  • Copyright
  • Frequent questions
Documents
  • Dating Guide
  • Thesis authorization
  • Document authorization
  • How to prepare a thesis (PDF)
Services
  • Digital library
  • Chilean academic journals portal
  • Latin American Repository Network
  • Latin American theses
  • Chilean theses
Dirección de Servicios de Información y Bibliotecas (SISIB)
Universidad de Chile

© 2020 DSpace
  • Access my account